Ensuring closed stirrups and longitudinal bars are provided where torsional thresholds are exceeded. 5. Column and Axial Member Detailing
): Clearly specify the required strength at 28 days for each structural element (e.g., foundations, columns, slabs). crsi design checklist pdf
Shear failures are brittle and catastrophic. Pay close attention to: Ensuring stirrup spacing does not exceed where required) or 24 inches. Ensuring closed stirrups and longitudinal bars are provided
: Improving the clarity of structural drawings so that ironworkers and contractors understand exactly where and how to place reinforcement. Impact on the Job Site crsi design checklist pdf
Inadequate concrete cover leads to premature rebar corrosion and structural degradation.
Detailed checks for seismic and structural wall considerations. Typical Content of a CRSI Design Checklist